Construction of the first shield tunnel in the main urban area of Chuanjie Bao for Nanchang Metro Line 3

* 来源 : * 作者 : admin * 发表时间 : 2019-02-15 * 浏览 : 5

On the morning of January 17, with the cutter head of No. 3 Shield Machine moving slowly out of the tunnel, the shield machine on the right line of the line from Shengjin Tower Station to Liuyanjing Station of Nanchang Metro Line 3 has been successfully received, which marks the smooth connection of the first shield tunnel running through the main urban area of Nanchang Metro Line 3.
      The Right-Line tunnel is from Shengjin Tower Station to Liuyangjing Station. The length of the tunnel is 1217.9 meters. The line is laid along the forward road and Xiangshan South Road. The shield machine started from the Rope Tower Station on September 29 last year.
      Up to now, 14 stations of Nanchang Metro Line 3 have been sealed, 8 stations are under earthwork excavation and main structure construction, 10 single lines have been connected and 10 shield tunneling sections are under construction.