Wuhan Rail Transit Line 5 has been completed on both lines

* 来源: * 作者: admin * 发表时间: 2021/02/03 11:00:29 * 浏览: 46

At 18:18 on January 31, with the shield tunneling machine receiving the left line between Wujindi Road Station and Fuxing Road Station, the 552 ring pipe piece of the tunnel and the last ring pipe piece of the line were completed, marking the completion of the whole line of Wuhan Rail Transit Line 5.

There are 23 underground sections (including the entry and entry lines) in the whole project of wuhan rail transit line 5. The geological conditions are complicated, among which 10 sections cross the first grade terrace of the Yangtze river, 13 sections cross the second and third grade terraces of the Yangtze river, and some sections cross the karst development area and soft soil layer. The surrounding environment of the interval along the line is complex. The interval between Pengliuyang Road Station and Simenmen Station adopts the mining method to cross the hard rock strata of Sheshan Mountain, and crosses the railway subgrade and bridge under several intervals. An existing building (structure); Municipal bridge, comprehensive pipe gallery; There are major difficulties such as subway interval.

The 35.2 km rail transit line 5 project runs from the Southern Third Ring Road in the south to Wuhan Railway Station in the north. There are 25 stations in the whole line. The main structure has been completed and the public area in the station is being renovated. The whole track is 74.2 km, and 69.2 km has been completed in total.