logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 02-11 2018

      Harbin subway construction is in full swing.

      At the end of the third phase of Metro Line 1, passenger test operation will be realized, all civil works will be completed in the first phase of Metro Line 2 this year, and all 19 stations in Southeast Half Ring will be closed at the end of the second phase of Metro Line 3. At present, the construction of Harbin metro line is in hot construction.


    • 30-10 2018

      Kunming Metro Line 4 realizes Kunming's first shield tunneling underneath the Metro Line

      On October 28, the right-hand line of the Donghua-Dashuying section of Kunming Metro Line 4, built by the Urban Rail Branch of the Fourth Bureau of China Railway, smoothly penetrated Kunming's first shield tunneling machine into the subway line 3.
    • 25-10 2018

      New progress has been made in metro line two, from Longcheng Street West Station to central street west station right line shield.

      October 23, Shanxi Evening News reporter learned of the latest progress of Taiyuan Metro Line 2, Longcheng Street West Railway Station to Central Street West Railway Station right-hand shield through, the smoothly capped Tiger Camp Station.
    • 23-10 2018

      Chengdu Metro Line 3 phase two or three project Xindu all shield originating

      According to Chengdu Metro, on Feb. 10, 2017, with the smooth start of shield machine from Jinshuihe Station to the right line of Tuanjie New Area Station and from Chengdu Medical College Station to the right line of Zhonglou Station in the 2nd and 3rd stage of Chengdu Metro Line 9, and from the 11th stage of Chengdu Medical College Station to the right line of Zhonglou Station, six shield tunnels in the 2nd and 3rd stage of Che Originating, the first blow to speed up the net assembly.
    • 19-10 2018

      Shenzhen metro construction "14 lines in one volume" in the next 4 years on average, at least two new lines a year.

      October 18, Shenzhen Metro Group said that since the beginning of the year, the construction of 14 lines in Shenzhen Metro, the number of projects, heavy tasks, investment, the most in all years.
    • 16-10 2018

      Shijiazhuang Metro Line 1 two phase river crossing tunnel smoothly through

      This morning, after a year of crossing the New Town Bridge and the Hutuo River, the tunnel between Dongzhuang Station and the Convention and Exhibition Center Station of the Shijiazhuang Metro Line 1 Phase II Project, which is 3.4 kilometers long, has laid a solid foundation for opening to traffic in 2019. The tunnel is also the longest subway shield tunnel in North China.
    • |<
    • <<
    • 57
    • 58
    • 59
    • 60
    • 61
    • 62
    • 63
    • 64
    • 65
    • 66
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 2106, No. 138 Pingxingguan Road, Jing'an District, Shanghai

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回