logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 06-07 2020

      Shield of left line of Yantong Park Station - Cuihu Station of Kunming Subway Line 5 starts smoothly

      Recently, the shield tunneling of the left section between Yantong Park Station and Cuihu Station of Kunming Metro Line 5 started smoothly, marking the construction of the left section of the tunnel between Yantong Park Station and Cuihu Station of Kunming Metro Line 5 contracted by China Railway 18 Bureau 4 Company.

    • 02-07 2020

      The first station on the western section of Changsha Metro Line 6 was capped ahead of schedule

      Changsha metro Line 6 construction ushered in a new progress. July 2, Changsha Metro Line 6 project Department of China Railway No.5 Engineering Group learned that the main structure of Changsha Metro Line 6 station was capped yesterday, which is the first capped station of the western section of metro line 6, 20 days ahead of schedule.
    • 30-06 2020

      Shanghai Airport liaison line project 8 bid project officially started

      On June 28, the 8th bid project of Shanghai Airport liaison line was officially started.
    • 28-06 2020

      "Yuehai no. 44", the first shield machine in the main tunnel of the Pearl River Delta Water Resources allocation Project, starts

      On June 26, 6.28 meters in diameter, total length of 91 meters, weighing more than 500 tons of a large bay area of guangdong, the pearl river delta configuration of water resources the main tunnel is the first project of shield machine, "guangdong 44", in D2 label SZ29-1 officially starting work well, marks the national major water conservancy project formally entered the stage of main water conveyance tunnel of shield construction, new horn plays engineering construction.
    • 22-06 2020

      The tunnel connecting the left line from Central Park East Station to Congyansi Station in the second phase of Chongqing Rail Transit Line 9

      Recently, as the "departure" 2 whole section tunnel boring machine (TBM) cutter slowly from the receiver to break rock, which means that the central park station to the smooth realization of the left line between rock temple station tunnel breakthrough, achieved after return to work and production stages in the construction of rail transit, at the same time for the second phase of line 9 promote the next phase of track-laying and other follow-up work has laid a solid foundation.
    • 18-06 2020

      Suzhou Rail line 6 double excavation, opening time set

      On the morning of June 16th, the shield tunneling machine "Gongfu 2" smashed the ground and set off smoothly at the right line of Jinchu Street Station. This marks the realization of dual tunneling of Suzhou Metro Line 6, which speeds up the tunneling of shield of Line 6 again.
    • |<
    • <<
    • 31
    • 32
    • 33
    • 34
    • 35
    • 36
    • 37
    • 38
    • 39
    • 40
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 2106, No. 138 Pingxingguan Road, Jing'an District, Shanghai

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回