logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 20-04 2021

      The left line from Shunfan Road Station to Jinshajiang Road Station of Suzhou Rail Transit S1 has been fully connected

      Suzhou Rail Transit Line S1 is a demonstration project of integrated infrastructure interconnection in Yangtze River Delta. Today (April 18), the left section of Suzhou Rail Transit Line S1 from Shunfan Road Station to Jinshajiang Road Station was completed.
    • 14-04 2021

      The Yuzhu tunnel will start construction next month and open to traffic in May 2025

      Recently, the Yuzhu Tunnel started EIA announcement. The Yuzhu Tunnel starts from Haizhu Xingang East Road in the south, runs north through the Pearl River and Beidisha Island, and runs through Huangpu Avenue before being ground to the south of the left branch of Sham Chung.
    • 12-04 2021

      The tunnel of the first section of Guangzhou Line 18 has been completed

      Recently, Guangzhou Metro Line 18, under construction, has welcomed the construction of a major project node, with the smooth completion of the underground tunnel between Modiesha and Xian Village, marking the completion of the first section of Line 18 (Wanqingsha to Xian Village) tunnel.
    • 09-04 2021

      The 10-mark shield tunneling section of Line 1 of Shaoxing Metro has been fully connected

      On the morning of April 7th, the construction of the last section of the 10-standard of Shaoxing Line 1, "Higher Education Park Station - Qunxian Road Station", was successfully completed, marking the completion of all 10-standard shield tunneling sections.
    • 07-04 2021

      Shanghai Rail Line 18 Phase II EIA public

      April 13, Shanghai Rail Transit Line 18 Phase II project environmental impact statement for public opinion solicitation (the first public EIA).
    • 02-04 2021

      Across the Xiangjiang River! Shield tunneling machine of Xiangya Road crossing river channel project startedv

      On March 30, the project of xiangya road crossing river tunnel, invested by changsha chengfa group and contracted by China railway 14th bureau group, officially entered the shield construction stage. In the next nine months, the shield machine built in Changsha will swallow rocks and chew soil, cross the Xiangjiang River, and open another tunnel connecting the east and west sides of the river.
    • |<
    • <<
    • 19
    • 20
    • 21
    • 22
    • 23
    • 24
    • 25
    • 26
    • 27
    • 28
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 2106, No. 138 Pingxingguan Road, Jing'an District, Shanghai

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回