logo
  • 中文版
  • English
    • Home
    • Go into Tianhao
      • Abut usCorporate CultureCertificateSpeechVideo
    • News
    • Products
    • Case
    • Contact
      • Contact usGbook

    All News

    News Sort

    • Company news
    • Industry information
    • Latest announcement
    • 13-08 2021

      Shenzhen Metro Line 8 phase II yanbei section double line smoothly through

      On August 11th, the shield machine cutter head of the right line of Yanbei section (namely "Yantian Road Station ~ Beishandao Station") of subway Line 8 phase II broke through the ground and reached the receiving well successfully. At this point, the north section of the double line smoothly through. This is also the first double line of line 8 phase ii.
    • 27-07 2021

      Yugan section of northern extension section of Chongqing Metro Line 5 is connected by two lines

      On July 23, yuhegou Station and Ganyue Avenue Station of the northern extension section of Chongqing Metro Line 5 were connected, 19 days ahead of schedule, and the node target was successfully completed, laying an important foundation for the "dongtong" of the whole line.
    • 19-07 2021

      "Ma Wan" Super Large Diameter Mud Water Balance Shield Machine launched

      On July 15, the super-large diameter mud-water balance shield machine "Ma Wan", with a diameter of 15.53m, was launched at the 2nd standard of Shenzhen Ma Wan Cross-sea Channel, which was built by Shenzhen Transportation and Public Facilities Construction Center and China Railway Tunnel Bureau.
    • 18-06 2021

      Zhanjiang bay undersea tunnel 330 tons heavy shield machine cutter head smoothly down well

      On June 17, at 9 am 22 points, in zhanjiang bay tunnel project construction site, "yongxing date" of shield machine cutter head start "in", after a tense hoisting operation, under the huge shield cutter head smooth lifting Wells, marked the shield unit work phased victory, to open in the sea next trip to lay a solid foundation.
    • 07-06 2021

      The world's first large diameter ultra-small turning TBM "Funing" off the production line

      On the morning of June 4th, the world's first large diameter (9.53m) ultra-small turning TBM "Funing" was successfully rolled off the production line in Tianjin. The minimum turning radius of the device is 90m, and the maximum longitudinal slope is 9.02%, which is the equipment with the smallest turning radius and the largest longitudinal slope in the world of large diameter TBM.
    • 28-05 2021

      The first section of Guangzhou Metro Line 22 was completed with short rail

      On May 25, the first section of Guangzhou Metro Line 22 (Panyu Square to Chentougang) was completed with the last 25-meter rail section from Panyu Square to Chentougang station.
    • |<
    • <<
    • 7
    • 8
    • 9
    • 10
    • 11
    • 12
    • 13
    • 14
    • 15
    • 16
    • >>
    • >|
    Shanghai Tian Hao Industrial Co., Ltd.

    Add: Room 2106, No. 138 Pingxingguan Road, Jing'an District, Shanghai

    Tel: 021 -61856883/32556939 
    Fax: 021 -61856883/32556919 
    E-mail: thsy@tianhaoshiye.com 
    URL: www.tianhaoshiye.com 

    Counseling Hotline

    021-32556939

    About Us丨Contact Us丨Web site map
    Copy Right Shanghai Tianhao Industrial Co., Ltd.
    点击编辑内容 点击编辑标题 向上移动 向下移动 点击新增模块 点击删除
    关闭返回