-
31-08 2022
China's longest undersea shield tunnel of intercity railway has successfully crossed the artificial island of Shenzhen-Zhong passageway
On August 29, the longest undersea shield tunnel of intercity railway in China, the left line shield tunnel "Shenwan II" of Suiguan-Shenzhen Railway front section project, which was built by China Railway 14th Engineering Bureau, successfully crossed the artificial island of Shenzhen-China tunnel, which marked that the double-line shield structure of the project had completed undercrossing the major risk source. -
23-08 2022
The section from Hongshengsha to Yufengwei of the second phase of Guangzhou Metro Line 7 has successfully crossed the Pearl River
Recently, the second phase of Guangzhou Metro Line 7 from Hongshengsha to Yufengwei has successfully completed the task of crossing the Pearl River, realizing the linking of two lines. -
17-08 2022
Shanghai rail transit will cross the Yangtze River for the first time, and the countdown has begun for the departure of the Shentong, a large shield train on the Chongming line
The Chongming line of Shanghai rail transit has made new progress. "Shentong", a large shield vehicle tailored for Chongming Line, has completed pre-assembly and officially entered the welding stage of the cutter head of the large shield vehicle. -
09-08 2022
The main line structure of Hudong Project in the third bid section of Suzhou Jinji Lake Tunnel is successfully connected
On the morning of August 8, the opening ceremony of the main line of Hudong Project of the third bid section of Suzhou Jinji Lake Tunnel was successfully held. -
02-08 2022
The left line tunnel between Diejiao Station and Zhongshan Park Station of Foshan Metro Line 3 has been successfully completed
On July 28, blessed in the afternoon, with the noise of the shield machine broken wall, foshan metro line 3 engineering pile between beijiao station to zhongshan park station of the left line ", 68 "god save the shield construction machine smoothly into the steel sleeve, tunnel implementation, this 3205-2 standard (south China sea square station - fold kau station and zhongshan park station, railway station) of the left line of three interval tunnel have been well versed in, A new breakthrough has been made in the key point of shield tunneling in the northern section of Line 3 project. -
26-07 2022
At present, the installation length of submarine tunnel sinking pipe reaches 4372.8 meters
On July 24, Guangdong Communications Group announced that after the completion of the sinking of the 9th tube section (E24) on the east side of the Shenzhongdao immersed tube tunnel on July 22, the 19th tube section (E19) on the west side of the tunnel also took root in the sea during the same construction window period. So far, the installation length of the submerged pipe of the project undersea tunnel reaches 4372.8 meters.